Schematic overview of the energy development project in Rwanda
Flow
chart of the project
During a second mission in Rwanda, with the colleagues of the MINERENA, we have set up the Concept Document for the GEF (Global Environment Facility).
The whole "plan concept" is detailed in the following organization chart and in the Concept Document submitted after the comments by the MINERENA and UNIDO (cf. doc J-CS/Rw/9415, doc J-CS/Rw/9417) for the GEF financial participation.
N/Réf. : Réf J-CS/ Rwa-2/7005-K |
||||||||
Project Title : Rural and peri-urban electrification and energy efficiency, and protection of the environment by the development of renewable energy (small hydro and geothermal). |
||||||||
PROJECT ORGANISATION FLOWCHART |
||||||||
Timetable |
ACTIVITIES |
EXPECTED RESULTS |
||||||
Concept activities |
||||||||
| UNIDO Mission | Project concept drafting in collaboration with the government of Rwanda |
|||||||
15 days |
Approval by Rwanda |
|||||||
| End of July | Transmission to Rwanda and to the GEF (through focal point) |
|||||||
Document describing the project |
Preliminary drafting of the PDF B (US $ 340 000) |
|||||||
GEF Approval of concept paper |
||||||||
Document describing the activities, results, benefits, etc. of the project (US $6M) and of the PDF (US $340 000) |
Drafting of the PDF B (US $ 340 000) |
|||||||
| 3 months | Transmission of the PDF B to Rwanda and to the GEF |
|||||||
GEF Approval of the PDF B (3months) |
||||||||
PDF B activities |
||||||||
![]() |
|
![]() |
||||||
CAPACITY BUILDING (human, material / equipment, structural, etc.) |
CAPACITY BUILDING (human, material / equipement, structural, etc.) |
AN OPERATIONAL ENERGY DIVISION (MINERENA) |
||||||
CREATION OF THE PROJECT STEERING COMMITTEE (PSC) - project coordination, leadership, supervision, accountability, participation, monitoring, feedback, evaluation - Definition of members and role, setting up, etc. |
Personnel, equipement, mission statement, strategie, policies, methods, etc. |
|||||||
PRIVATE SECTOR |
INSTITUTIONAL SECTOR - MINERENA |
Strengthened competencies in the fields of RE techniques, regulations, finance, etc. |
||||||
1 - Provide assistance to aid technology transfer and the establishment of joint ventures (SHP China) through workshops and technology forums. |
1 - Workshops and forums to present and set the project in motion and to call for project partners (banks, NGOs, craftsmen, local representatives, Electrogaz, private companies, etc.) |
1 - Training of MINERENA technicians ( energy planning, energy managment, etc.) | ||||||
Creation of a Central PSC - project coordination, monitoring, evaluation etc. |
2 - Training of technicians from other ministries by the MINERENA technicians (renewable energy techniques, technologies, etc.) |
A network of technicians in each region, with the means and competencies to act locally (project information dissemination, support, feedback, coordination, etc.) |
||||||
2 - Reinforcement of technical capacities of private sector technicians through work placements in companies (in China, Kenya and Europe) and technology fairs (by sector of activity and / or by theme) |
Definition of PSC membership, role and procedures, etc. |
3 - Establishment of a technical, regulatory and fiscal documentation |
A community documentary database (technical, legal, etc.) available for use by all state services | |||||
Support for the creation of companies specialising in the assembly, construction and installation of energy production plants |
Creation of a network of decentralized, local PSCs |
4 - Drafting and implementation of renewable energy legislation (tax exemptions, etc.) |
Legal, regulatory framework (definition of technical standards and financial conditions of RE development) |
|||||
PDF Execution |
Support for the creation of companies specialising in financing the construction and setting up of energy production plants | 5 - Drafting and implementation of energy and renewable energy regulations, standards and norms (technical, fiscal, etc.) |
Catalogue and map of potential SHP sites, indication of investment and exploitation costs, indication of construction, exploitation and maintenance structures, indication of social structures (property, exploitation, finance), etc. |
|||||
| 6 - Training of a decentralized network of MINERENA field technicians to act locally in rural areas (renewable energy techniques, etc.) | Catalogue and map of potential MGP sites, indication of investment and exploitation costs, indication of construction, exploitation and maintenance structures, indication of social structures (property, exploitation, finance), etc. |
|||||||
| 2 years | 2 - Creation of a practical guide to the procedure for setting up SHP and Geothermal installations and the accompanying financial, exploitation, maintenance etc. structures necessary for energy production plants | 7 - Energy assessment of craftwork and industrial sector companies (public and private) | ||||||
| 8 - Identification and technical and financial feasibility studies for Mini Geothermal Power plants (MGP) and field exploration activities - BRGM | ||||||||
| US $ 340 000 | 3- Regular workshops and forums for project coordination, information and feedback sharing, monitoring, evaluation etc. (Banks, NGOs, craftsmen, technicians, Electrogaz, local representatives, etc.) | 9 - Identification and technical and financial feasibility studies for Small Hydro Power plants (SHP) and fieldwork activities | Energy efficiency recommendations and energy-saving activities including energy, financial, environmental and other assessments |
|||||
| Support for the creation of companies specialising in the assembly, construction and installation of energy production plants | GROUP OF OPERATIONAL PRIVATE COMPANIES - construction, maintenance, exploitation, financing etc. in the renewable energy sector |
|||||||
| Support for the creation of companies specialising in financing the construction and setting up of energy production plants | Personnel, equipment, mission statements, strategies, policies, methods, etc. |
|||||||
| Project Brief (french + english versions) | Strengthened competencies in the fields of RE techniques, regulations, finance, etc. |
|||||||
RE construction, exploitation, maintenance and finance companies and others, established in each region, with material means, qualified personnel, etc. |
||||||||
PROJECT DOCUMENT (french + english versions) |
Document describing all aspects (activities, results, benefits, etc.) of the project (US $ 6 M) | |||||||
| Strengthened private sector - companies specialising in construction, exploitation, financing etc. of energy production plants | CENTRAL PSC + LOCAL PSCs | MINERENA - fully operational Energy Division ( legal, regulatory frameworks, network of competencies, decentralized technical network, etc.) | ||||||
![]() |
|
![]() |
||||||
Project Execution |
Poject activities |
|||||||
Energy efficiency programme |
||||||||
4 years |
Small Hydro Power programme (SHP) |
|||||||
Mini Geothermal Power programme (MGP) |
||||||||
| Programme implementation | ||||||||
| US $ 6 M | Construction of SHP plants # 2 MW |
SHP (# 2 MW) |
||||||
Construction of MGP plants # 2 MW |
MGP # 2 kW |
|||||||
|
||||||||
THROUGH REPLICABILITY & SUSTAINABILITY |
||||||||
Continuation of the Small Hydro Power (SHP) and Mini Geothermal Power (MGP) programmes > 10 MW |
50 SHP plants (# 10 MW) +X MGP plants # 2 MW | |||||||